PARADISE VALLEY SOLAR Project & ENERGY CAMPUS
Located on 10,300 acres of contiguous, privately owned land in Northern Nevada, the Paradise Valley project is designed to support massive utility-scale solar generation and advanced energy infrastructure.
Designed to support increasing demand projections from NV Energy, which continues to expand infrastructure to meet future load requirements.
CONTIGUOUS ACRES
MWh DAILY YIELD
MILES TO WINNEMUCCA
GREENLINK SUBSTATION PROXIMITY
Positioned for immediate integration, the Paradise Valley Campus leverages inherent logistical and geographical advantages to expedite utility-scale deployment.
Seamless physical connectivity via established pathways, significantly reducing development timelines and overcoming traditional logistical barriers.
10,300 contiguous acres providing unparalleled development flexibility and security, free from the entanglements of fragmented public land ownership.
Strategic proximity to major planned expansions like the Greenlink Substation streamlines power integration and long-haul distribution.
Strategic positioning for efficient grid interconnection.
Preparing rigorous technical and financial documentation tailored to meet NV Energy's stringent procurement standards and future load requirements.
Structuring the Power Purchase Agreement to guarantee long-term, stable off-take commitments from regional utilities, mitigating operational risk and creating opportunities to negotiate competitive energy rates.
Leveraging our scalable capacity and strategic location to negotiate highly favorable energy rates designed to deliver strong institutional returns.
PVDG is strategically positioned to navigate the NV Energy RFP framework. By aligning our development timeline with projected regional load requirements, we de-risk the asset and establish a clear pathway to securing a robust Power Purchase Agreement.
A calculated, methodical approach to deploying utility-scale infrastructure aligned with verified market demand.
Our 10,300-acre contiguous land position supports a measured, highly disciplined capital rollout. By aligning infrastructure investments precisely with confirmed market demand, we mitigate upfront financial exposure while maintaining aggressive scalability.


Beyond baseline utility-scale generation, the Paradise Valley master plan acts as a foundation for next-generation energy ecosystems. The site geometry and proximity to grid interconnections natively support massive-scale energy storage and high-density data center campus requirements.
SEC Disclosures
ESG & Impact Report
Terms of Service
Privacy Policy

Pioneering energy-dense real estate and grid-independent infrastructure for the digital future. Engineered for scale, designed for elite partnerships.
Our Project
Partnerships
Investor Forum
Join Us
SEC Disclosures
ESG & Impact Report
Terms of Service
Privacy Policy
Access the Paradise Valley data room for comprehensive financial models, technical specifications, and RFP strategy documentation.
Strictly confidential. Institutional investors only.

Managed by PVDG.
Powering the future of utility-scale energy through strategic alignment and infrastructure development.
Located approx. 15 miles north of Winnemucca, Nevada, USA.
10,300 Contiguous Acres
Adjacent to Greenlink Substation
© 2026 Paradise Valley Solar & Energy Campus. All rights reserved.